We spent 11 hours working on putting the motor together yesterday. Very productive.
We got the pistons installed, the S&S cylinders installed, the heads installed with Adjustable rocker arms, the HPI port matched intake and HPI 62 mm throttle body installed also, its almost to good looking to cover. 6.1 injectors in. I also went with black lifter block covers and push rod covers.
Motor is together, installed the Heavy Breather extreme, very tight fit with the Fang, about 1/3 inch clearance. However it or the Ventilator extreme is needed to flow enough air. Started right up, and did the first heat cycle.
Today I need to get a two more heat cycles done, then a little ride to seat the rings. Also need to put things back on like mid frame heat deflectors, heat shields, floor boards and so on.