Not the new one but my satin black 94. Today I extended the tongue by 6 inches. Toughest part of the job was the wiring and air lines. Took about three hours for everything. Bushtec wanted $375.00 plus shipping I have about $35.00 plus my labor invested.
Started to do the newest one however it has apparently sat outside or somewhere to draw moisture. Tongue is rusted fast to the 1 1/4 stub. Hit it with some PB Blaster will let it sit a few days and see if I can get it freed up.
Haven't had much time to work on the new one. One of my closest friends was diagnosed with ALS last year. They moved o South West Georgia and I take care of their property here. Got a e mail Thursday morning from Everett telling me goodbye. Scared me so I called his wife no answer sent text no answer so I jumped in my truck and headed south. Glad I did , he had lost 100 pounds in a year, could not talk and was on full time oxygen. Sat on his bed and held his drawn up little hands, we laughed we cried but most off all I realized he was ready and was good with God.
Checked on him twice a day everyday. On Tuesday, April 21, 2015 at a little after 5AM my dear friend left us to be with Jesus. Everett was a very detail oriented individual, had a photographic memory, hope God has his paperwork in order if he doesn't E will let him know. He even wrote down what I was to wear to the funeral, going to be a country funeral whatever that is.
Will get back on the new trailer sometime, not much in the mood right now.