Don't want to sound overly optimistic here, but I will be somewhat optimistic right now. Feuling shipped all their stuff out, and it will be at the dealer by Fri. That takes care of the camplate, oil pump, Hi Tensile cyl. studs and headbolts, all new ARP top end and cover hardware, and .120" Racing Pushrods! Wes is shipping everything but the Axtell Solid Barrels out today, and should be at the dealer by tomorrow or Fri. That's the reworked heads and forged pistons-both Thermal Coated, rings, and new Cometic Gasket Set. The Barrlels should be completed tomorrow and drop-shipped from Axtell to the dealer, and also be there by Fri. I can't believe every aspect of this mess, since the beginning, has come down to the wire. I'm fortunate to be working with all stand-up people, Wes-Cycle-rama, Luke-Feuling, and Bogie-NRHD, who have all met every committment they've made so far. If all the parts show up by Fri as promised, this bike should be back together by Mon or Tues.
I'll be thrilled with that. I'll get some good miles on it next week after heat cycling the engine first. This might even allow me to cancel the trailer I have reserved, and ride up to Neal's on Fri instead That would make me very happy!!!
No jumping sausages yet, but I will remain cautiously optimistic for now. More after the weekend!

Hoist!
