Greate job on the bars and pipe Aussie
As soon as I get enough time it is a fairly big job, (I seem to have time for small jobs) I have every part I need just need to have the fender painted (when I drop that off it wil take about 4 - 5 weeks) & the swingarm chromed after I make sure they fit OK. I know it's taking me a long time to make it happen but it will happen!
Cheers
Aussie
I was going to do a 250 or a 300 tire with a right side drive before starting on building the hard bag brackets. Then I discovered the frame had to be cut to relocate the strutts. I know you have already researched this but to get the 200 tire between the struts may I ask are you going to reweld the brackets to the frame or are you going to make some brackets to relocate the positioning of the wider fender.