summer project 2010
« on: June 16, 2010, 01:11:38 PM »

As the weather is so wet this year we decided to create a new all weather room in the garden, a conservatory, or a Winter Garten as they call it in Switzerland, the planning process had already started in Feb/March, choosing a design and getting quotations and seeking an extra loan on the mortgage, work will be done in between priority events like rallies and GTG etc so planned completion wont be until Aug/September.
 Wigasol is the company we will purchase it from, the model we have chosen is Elegance, dimensions will be 5.4m by 3.2M, 16foot by 9.5feet or so

http://www.wigasol.ch/index2.htm

1st pic taken in May 2010 shows where the new room will be erected at the back of the house, you will see the two poles showing where the proposed structure will stand
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #1 on: June 16, 2010, 01:12:58 PM »

planning permission is granted by early June, so ground work begins
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #2 on: June 16, 2010, 01:14:09 PM »

half of the old flag stones have been removed
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #3 on: June 16, 2010, 01:16:02 PM »

the light shaft to the garage had to be lowered 10inches, 4 hours work to cut to reinforced concrete with a diamond tipped angle grinder and a large sledge hammer
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #4 on: June 16, 2010, 01:17:20 PM »

the rubble, waiting to be taken to the recycling
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #5 on: June 16, 2010, 01:18:17 PM »

an essential tool for this kind of project
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #6 on: June 16, 2010, 01:19:18 PM »

the window shutters and the sun blind have been removed
« Last Edit: June 16, 2010, 01:39:20 PM by ice6900 »
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #7 on: June 16, 2010, 01:20:15 PM »

lowering the earth level
Logged

Gone Fishin'

  • The Director
  • 1K CVO Member
  • *
  • Offline Offline
  • Posts: 1984

    • CVO1: 2016 FLHTKSE Limited®, Black Sparkle and 2010 FLHTCUSE5 Ultra Classic®, Crimson Mist Black/Dark Slate, # 110 of 992
    • CVO2: 2007 FLHRSE3 Screamin' Eagle® Road King®, Black Ice, 1 of 1325
    • CVO3: 2001 FXDWG2, Scarlet Red and 2000 FXR4, Candy Tangerine, 1 of 316
Re: summer project 2010
« Reply #8 on: June 16, 2010, 01:23:10 PM »

You've always been taking the pictures after the people you hired to do the work left, hey?
Logged

1914 10E, Grey
1956 FLH Custom, Candy Orange
1988 FXRS Custom, "S.O.A."
2000 FLSTF Custom Fat Boy, "Jumpin' Jack Flash"
2000 FXSTS Custom Springer Softail, Grey
2000 FXR4, Candy Tangerine
2001 FXDWG2, Scarlet Red
2005 FLHTCSE2, -9/07
2007 FLHRSE3, Black Ice
2008 FLHTCUSE3, -7/08
2009 FLHTCUSE4, -4/10
2010 FLHTCUSE5-BLK, Crimson Mist Black/Dark Slate
2012 VRSCDX ANV, Brilliant Silver Pearl
2016 FLHTKSE, Black Sparkle
2016 XL1200CX Roadster, Vivid Black
2018 FLFBS ANV
CVO 1480 IBA 26678

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #9 on: June 16, 2010, 01:24:08 PM »

@ Louis. its very difficult to take pictures of myself working

temporary storage for the old sun blind and window shutters
« Last Edit: June 16, 2010, 01:26:29 PM by ice6900 »
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #10 on: June 16, 2010, 01:30:00 PM »

ground work almost completed
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #11 on: June 16, 2010, 01:31:10 PM »

seems to have been a 6 beer job
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #12 on: June 16, 2010, 01:32:18 PM »

ground level seems ok, atleast within tolerance
Logged

ice6900

  • 2.5K CVO Member
  • **
  • Offline Offline
  • Posts: 3268

    • CVO1: fxstsse 07
    • CVO2: (non cvo) fxdl customised
    • CVO3: (custom)arlen ness 1914 flat trak replica
Re: summer project 2010
« Reply #13 on: June 16, 2010, 01:33:48 PM »

sketch of what will go here in early August, but there is still a few lil jobs to do, like reroute the television antenee cable and a little plastering work before the base framework arrives sometime in July, there are a few rallies to attend between now and then.

Wigasol have planned Aug 3 and 4th to send me two guys to erected the structure with our help, on Aug 5th we leave to catch the early evening ferry Calais Dover to go to Sofer.
« Last Edit: June 16, 2010, 01:43:50 PM by ice6900 »
Logged

Chains

  • 5k CVO Member
  • ***
  • Offline Offline
  • Posts: 8459
  • 2006 FLHTCUSE
    • FL

Re: summer project 2010
« Reply #14 on: June 16, 2010, 01:42:02 PM »

Nice job so far, looks like you will have a great addition to enjoy
Logged
2009 FLHTCUSE
12 inch Monkey bars
Stage one kit
Fullsac SS titanium coated DX dual pipe
Kuryakyn 4 inch Mellow Crushers
Color Matched Bushtec Turbo 2
1st Active member of the CVO Critter Gawkers Society
Pages: [1] 2 3 ... 6  All
 

Page created in 0.14 seconds with 20 queries.