Well guys I had to replace my right side bag as it fell off going down the road lost both pins. and away it went a 1235.00 lesson. It only took 4 weeks to get the Cherry bag in. Eric S at Chicago Harley has been great to deal with

He is only there on Saturdays as he is helping to setup their new store, so if you need parts and want the right ones ask for him.
BAD NEWS:
Currently the bike that was going to be used for the Zippers Testing is in the shop for 10,500 dollars worth of damage done to it. My wife is ok, but she and the bike were rear ended and went down. They told us the Pumpkin Sheet Metal will take 14 days to get. They said the parts were in stock vs. the normal 56 days. All the other parts for replacement are in just waiting on sheet metal.
The items that were damaged were the Front Fairing, both lowers, both rear bags and fender. 6 pieces all from the same bike not sure if it helps to get them moved up in line or if they really were on the floor. Until the parts are in I have to put off the tests. We may be able to use my buddies 03 SERK we will have to see.
-harry